SAE AS683A
Installation Procedures and Torques for Fluid Connections.
These procedures cover the following:Paragraph 3 - Cone end connections for flared tube and brazed ferrule, with and without gasket.Paragraph 4 - Boss end connections, positioned type, with back-up ring.Paragraph 5 - Boss end connections, positioned type, without back-up ring.Paragraph 6 - Boss end connections, non-positioned type.Paragraph 7 - Bulkhead connections.
History:Standard | Published | Revision | Status |
---|---|---|---|
AS683D | 2012-03-01 | Latest | |
AS683C | 2001-10-01 | Historical | |
AS683B | 1980-01-15 | Historical | |
AS683A | 1976-09-01 | Historical |